LarryRosen
Joined: 16 Jan 2006 Posts: 415 Location: Medford, NJ
|
Posted: Sat Oct 14, 2006 10:59 am Post subject: Where to start on QB fuse? |
|
|
and also from my archives
Larry Rosen wrote:
Quote: |
Yes, just like the QB wings there are things undone.
Start by removing all the temporary pop rivets on the floor boards,
remove temporary pop rivets in the forward upper fuselage and get it
out of the way. Remove all the close out panels. Remove the seat
cover and seat floor. Remove the F1043D cover panel in front of the
seat. Soon the quickbuild will look allot less complete.
You will need to remove the landing gear mounts so you can put the
cabin floor in.
There is a nut plate that goes on the F-1040 upper fuse channel that
needs to be installed. Much easier to do before you rivet the F1042E
gusset in place.
Seat back brace needs to be pop riveted in place (remove the temp pop
rivets).
Probably forgot some stuff, but its a start.
Larry
http://lrosen.nerv10.com
Dan Masys wrote:
>
>
> With the wings essentially done, I started looking at the fuselage
> sections of the plans. As far as I can tell, everything has been
> done up through Section 29, and I should start with installing the
> steps (Section 30). Is that correct, or are there details of the
> sections 25-29 that are left undone by those talented folks in the
> Philippines?
>
> (Certainly would be nice if Vans would publish some
> quickbuild-specific instructions.)
>
> -Dan Masys
> #40448
>
>
>
>
http://www.matronics.com/Navigator?RV10-List
http://wiki.matronics.com
|
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
_________________ Larry Rosen
#40356
N205EN (reserved)
<http> |
|