Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Remaining questions for routing stuff under the floors

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
MauleDriver(at)nc.rr.com
Guest





PostPosted: Tue Oct 09, 2007 1:52 pm    Post subject: Remaining questions for routing stuff under the floors Reply with quote

At this point I think I have most of the electrical wiring in place:
- (2) Main power lines 2AWG and 8AWG for dual R14 dual batt/dual alt scheme
- (3) solenoid control lines for main power and crossfeed solenoids
- (2) shielded lines for left and right wing strobes
- (1) power line for strobe power supply
- (1) power for tail light
- (1) 7 multi conductor bundle for elevator trim
Yet to go are:
- (1) antenna coax for 1 comm anttenna (the other will go in wing tip or
upper fuse
- (2) Van's conduit for future revisions
- (1) for activation of projected new generation ELT (??)

Remaining questions are:
- What do I run for AHRS for projected dual Chelton panel
- Battery Bus - I'm thinking 3 lines for things like clock(?), dome
light and (??)
- Where does the static line run - can't find in plans or in archives
but I'm sure I've seen it before. Does it go thru center or along one
of the sides?

I'm assuming:
- That GPS and transponder anttennas will be forward of seats and/or in
cabin top
- Nav and Marker antennas will be in tips
- Nothing else can be run down the accessible center channel to avoid
interference with control system

All comments welcome.

Bill "filling up the fuselage bottom with systems" Watson
Durham NC #40605


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
LarryRosen



Joined: 16 Jan 2006
Posts: 415
Location: Medford, NJ

PostPosted: Tue Oct 09, 2007 3:17 pm    Post subject: Remaining questions for routing stuff under the floors Reply with quote

How about:
Pitch trim for autopilot. TT uses (1) 20AWG power, (1) 20AWG ground,
(6) 22AWG control. (use Stein's pre-twisted bundle
<http://www.steinair.com/wire.htm>

Run an RG-400 for a gps or some other antenna that you may want to add
to the rear of the canopy

Run the static line along with the wire.

Consider pulling some spare twisted pairs. I added a 3 and a 4
conductor. Who knows what I will use them for.

Consider 1 larger wire for the battery feed to a fuse block forward.

Will there be rudder trim in the future? (there's another 7 wires)

For the Chelton MSU (I will mount the GHARDS up front) you need (1) 3
conductor 22AWG shielded, (2) 22AWG power, (4) 22AWG ground

Strobe ground or ground local.

Larry Rosen
#356

MauleDriver wrote:
Quote:


At this point I think I have most of the electrical wiring in place:
- (2) Main power lines 2AWG and 8AWG for dual R14 dual batt/dual alt
scheme
- (3) solenoid control lines for main power and crossfeed solenoids
- (2) shielded lines for left and right wing strobes
- (1) power line for strobe power supply
- (1) power for tail light
- (1) 7 multi conductor bundle for elevator trim
Yet to go are:
- (1) antenna coax for 1 comm anttenna (the other will go in wing tip
or upper fuse
- (2) Van's conduit for future revisions
- (1) for activation of projected new generation ELT (??)

Remaining questions are:
- What do I run for AHRS for projected dual Chelton panel
- Battery Bus - I'm thinking 3 lines for things like clock(?), dome
light and (??)
- Where does the static line run - can't find in plans or in archives
but I'm sure I've seen it before. Does it go thru center or along one
of the sides?

I'm assuming:
- That GPS and transponder anttennas will be forward of seats and/or
in cabin top
- Nav and Marker antennas will be in tips
- Nothing else can be run down the accessible center channel to avoid
interference with control system

All comments welcome.

Bill "filling up the fuselage bottom with systems" Watson
Durham NC #40605


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Larry Rosen
#40356
N205EN (reserved)
<http>
Back to top
View user's profile Send private message Send e-mail Visit poster's website
MauleDriver(at)nc.rr.com
Guest





PostPosted: Wed Oct 10, 2007 11:24 am    Post subject: Remaining questions for routing stuff under the floors Reply with quote

Thanks Larry... Perfect! That helps a lot.

Larry Rosen wrote:
Quote:


How about:
Pitch trim for autopilot. TT uses (1) 20AWG power, (1) 20AWG ground,
(6) 22AWG control. (use Stein's pre-twisted bundle
<http://www.steinair.com/wire.htm>

Run an RG-400 for a gps or some other antenna that you may want to add
to the rear of the canopy

Run the static line along with the wire.

Consider pulling some spare twisted pairs. I added a 3 and a 4
conductor. Who knows what I will use them for.

Consider 1 larger wire for the battery feed to a fuse block forward.

Will there be rudder trim in the future? (there's another 7 wires)

For the Chelton MSU (I will mount the GHARDS up front) you need (1) 3
conductor 22AWG shielded, (2) 22AWG power, (4) 22AWG ground

Strobe ground or ground local.

Larry Rosen
#356

MauleDriver wrote:
>
>
> At this point I think I have most of the electrical wiring in place:
> - (2) Main power lines 2AWG and 8AWG for dual R14 dual batt/dual alt
> scheme
> - (3) solenoid control lines for main power and crossfeed solenoids
> - (2) shielded lines for left and right wing strobes
> - (1) power line for strobe power supply
> - (1) power for tail light
> - (1) 7 multi conductor bundle for elevator trim
> Yet to go are:
> - (1) antenna coax for 1 comm anttenna (the other will go in wing tip
> or upper fuse
> - (2) Van's conduit for future revisions
> - (1) for activation of projected new generation ELT (??)
>
> Remaining questions are:
> - What do I run for AHRS for projected dual Chelton panel
> - Battery Bus - I'm thinking 3 lines for things like clock(?), dome
> light and (??)
> - Where does the static line run - can't find in plans or in archives
> but I'm sure I've seen it before. Does it go thru center or along
> one of the sides?
>
> I'm assuming:
> - That GPS and transponder anttennas will be forward of seats and/or
> in cabin top
> - Nav and Marker antennas will be in tips
> - Nothing else can be run down the accessible center channel to avoid
> interference with control system
>
> All comments welcome.
>
> Bill "filling up the fuselage bottom with systems" Watson
> Durham NC #40605


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group