 |
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
dlm46007(at)cox.net Guest
|
Posted: Sat Jan 05, 2008 8:51 pm Post subject: Emailing: IMG_0956, IMG_0952 |
|
|
Its always a question whether the wings will match the fuselage when both
are QBs from different batches. we used grade 8 3/8s and 9/16s sizes. we
also had two long 3/8s of normal variety. We found the normal hardware bolts
to be about .369 and .559 respectively. The grade 8s were .373 and .559. The
NAS bolts were .373 and .561. Buy the ACE bolts and use a band saw to cut
off the threads; then grind and polish the ends with the grinder and
scotchbrite wheels. We lubed with LPS2. The actual time to install each wing
was about 5 minutes but the time to trim and install the fairings totaled
about 4.5 hours. That was after my pre prep of a couple of hours pulling the
hardware and tools necessary from the kit trays. Thanks Deems and Paul and
Tom for the extra muscle.
David and Claude
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
Description: |
|
Filesize: |
117.23 KB |
Viewed: |
120 Time(s) |

|
Description: |
|
Filesize: |
80.13 KB |
Viewed: |
128 Time(s) |

|
|
|
Back to top |
|
 |
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|