Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Another milestone in the building process

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
kearney



Joined: 20 Sep 2008
Posts: 563

PostPosted: Mon Dec 05, 2011 6:13 pm    Post subject: Another milestone in the building process Reply with quote

Hi
Well today I lit up my panel for the first time. Fortunately there was no smoke and things worked pretty much as advertised.
I did run into a couple of small hiccups - I installed the end plate on the audio panel tray upside down - a 10 minute fix. I also had to update the software on my AFS screens. This led to problem # 2. The update failed as my screens had software too old to update all at once. This is where good customer support is invaluable. Ken at AFS sent me the required software updates in separate patches and then update process went seamlessly.
When I started down the path of building my own panel, it was only the stellar products from Approach System (the FastStack Hub) and Vertical Power (VP-X electronic circuit breakers) that made the process doable by a rank amateur (me). Tim Haas (Approach) was very patient and helpful providing phone support as I figured out what wires went where and how all these black boxes tied together. Likewise Marc Ausman at Vertical Power was very helpful in laying out the wiring requirements / load planning.
The AFS / VP-X configuration interface works very nicely - it was fun watching each radio spin up as its circuit was activated using the AFS EFIS.
Although the process was fairly time consuming, I think a lot of it went into planning and laying out where things would go.
Based on my experience, I don't you could ask for much more in the way of support from Approach Systems / Vertical Power / Advanced Flight Systems.
Cheers
Les
#40643 [quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
View user's profile Send private message
rleffler



Joined: 05 Nov 2006
Posts: 680

PostPosted: Mon Dec 05, 2011 7:00 pm    Post subject: Another milestone in the building process Reply with quote

What, no pictures?

From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Les Kearney
Sent: Monday, December 05, 2011 9:11 PM
To: rv10-list(at)matronics.com
Subject: Another milestone in the building process

Hi
Well today I lit up my panel for the first time. Fortunately there was no smoke and things worked pretty much as advertised.
I did run into a couple of small hiccups - I installed the end plate on the audio panel tray upside down - a 10 minute fix. I also had to update the software on my AFS screens. This led to problem # 2. The update failed as my screens had software too old to update all at once. This is where good customer support is invaluable. Ken at AFS sent me the required software updates in separate patches and then update process went seamlessly.
When I started down the path of building my own panel, it was only the stellar products from Approach System (the FastStack Hub) and Vertical Power (VP-X electronic circuit breakers) that made the process doable by a rank amateur (me). Tim Haas (Approach) was very patient and helpful providing phone support as I figured out what wires went where and how all these black boxes tied together. Likewise Marc Ausman at Vertical Power was very helpful in laying out the wiring requirements / load planning.
The AFS / VP-X configuration interface works very nicely - it was fun watching each radio spin up as its circuit was activated using the AFS EFIS.
Although the process was fairly time consuming, I think a lot of it went into planning and laying out where things would go.
Based on my experience, I don't you could ask for much more in the way of support from Approach Systems / Vertical Power / Advanced Flight Systems.
Cheers
Les
#40643
Quote:
0
Quote:
1
Quote:
2
Quote:
3
Quote:
4
Quote:
5
Quote:
6
Quote:
7
Quote:
8
Quote:
9
Quote:
0
Quote:
1
Quote:
2
Quote:
3
Quote:
4
Quote:
5
Quote:
6
Quote:
7
Quote:
8
Quote:
9
Quote:
0
Quote:
1
Quote:
2
[quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Bob Leffler
N410BL - Phase I
http://mykitlog.com/rleffler
Back to top
View user's profile Send private message
kearney



Joined: 20 Sep 2008
Posts: 563

PostPosted: Mon Dec 05, 2011 8:17 pm    Post subject: Another milestone in the building process Reply with quote

Hi Bob

Attached is a picture - nothing exotic at this point. The panel is fiberglass - one that I bought eons ago (when I thought I was in for a 3 year build).

The inserts are bare aluminium for now as I have moved things around which means I have extra holes. I still want to install some annuciator lights over the EFIS screens and have to install some heating vent controls on the right side.

In early Jan I plan to make proper inserts (painted and printed etc).

I also want to install a USB outlet and an ELT remote switch on the right side of the panel.

Cheers

Les

From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Bob Leffler
Sent: December-05-11 7:50 PM
To: rv10-list(at)matronics.com
Subject: RE: Another milestone in the building process


What, no pictures?

From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Les Kearney
Sent: Monday, December 05, 2011 9:11 PM
To: rv10-list(at)matronics.com
Subject: Another milestone in the building process



Hi
Well today I lit up my panel for the first time. Fortunately there was no smoke and things worked pretty much as advertised.
I did run into a couple of small hiccups - I installed the end plate on the audio panel tray upside down - a 10 minute fix. I also had to update the software on my AFS screens. This led to problem # 2. The update failed as my screens had software too old to update all at once. This is where good customer support is invaluable. Ken at AFS sent me the required software updates in separate patches and then update process went seamlessly.
When I started down the path of building my own panel, it was only the stellar products from Approach System (the FastStack Hub) and Vertical Power (VP-X electronic circuit breakers) that made the process doable by a rank amateur (me). Tim Haas (Approach) was very patient and helpful providing phone support as I figured out what wires went where and how all these black boxes tied together. Likewise Marc Ausman at Vertical Power was very helpful in laying out the wiring requirements / load planning.
The AFS / VP-X configuration interface works very nicely - it was fun watching each radio spin up as its circuit was activated using the AFS EFIS.
Although the process was fairly time consuming, I think a lot of it went into planning and laying out where things would go.
Based on my experience, I don't you could ask for much more in the way of support from Approach Systems / Vertical Power / Advanced Flight Systems.
Cheers
Les
#40643
Quote:
0
Quote:
1
Quote:
2
Quote:
3
Quote:
4
Quote:
5
Quote:
6
Quote:
7
Quote:
8
Quote:
9
Quote:
0
Quote:
1
Quote:
2
Quote:
3
Quote:
4
Quote:
5
Quote:
6
Quote:
7
Quote:
8
Quote:
9
Quote:
0
Quote:
1
Quote:
2
Quote:
3


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List



IMG_0781.JPG
 Description:
 Filesize:  84.03 KB
 Viewed:  1096 Time(s)

IMG_0781.JPG


Back to top
View user's profile Send private message
robin(at)PaintTheWeb.com
Guest





PostPosted: Mon Dec 05, 2011 10:04 pm    Post subject: Another milestone in the building process Reply with quote

That is going to look great. I like the center console too.

Robin

From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Les Kearney
Sent: Monday, December 05, 2011 8:14 PM
To: rv10-list(at)matronics.com
Subject: RE: Another milestone in the building process



Hi Bob

Attached is a picture - nothing exotic at this point. The panel is fiberglass - one that I bought eons ago (when I thought I was in for a 3 year build).

The inserts are bare aluminium for now as I have moved things around which means I have extra holes. I still want to install some annuciator lights over the EFIS screens and have to install some heating vent controls on the right side.

In early Jan I plan to make proper inserts (painted and printed etc).

I also want to install a USB outlet and an ELT remote switch on the right side of the panel.

Cheers

Les


From: owner-rv10-list-server(at)matronics.com (owner-rv10-list-server(at)matronics.com) [mailto:owner-rv10-list-server(at)matronics.com] ([email][mailto:owner-rv10-list-server(at)matronics.com][/email]) On Behalf Of Bob Leffler
Sent: December-05-11 7:50 PM
To: rv10-list(at)matronics.com (rv10-list(at)matronics.com)
Subject: RE: Another milestone in the building process
What, no pictures?

From: owner-rv10-list-server(at)matronics.com (owner-rv10-list-server(at)matronics.com) [mailto:owner-rv10-list-server(at)matronics.com] ([email][mailto:owner-rv10-list-server(at)matronics.com][/email]) On Behalf Of Les Kearney
Sent: Monday, December 05, 2011 9:11 PM
To: rv10-list(at)matronics.com (rv10-list(at)matronics.com)
Subject: Another milestone in the building process



Hi
Well today I lit up my panel for the first time. Fortunately there was no smoke and things worked pretty much as advertised.
I did run into a couple of small hiccups - I installed the end plate on the audio panel tray upside down - a 10 minute fix. I also had to update the software on my AFS screens. This led to problem # 2. The update failed as my screens had software too old to update all at once. This is where good customer support is invaluable. Ken at AFS sent me the required software updates in separate patches and then update process went seamlessly.
When I started down the path of building my own panel, it was only the stellar products from Approach System (the FastStack Hub) and Vertical Power (VP-X electronic circuit breakers) that made the process doable by a rank amateur (me). Tim Haas (Approach) was very patient and helpful providing phone support as I figured out what wires went where and how all these black boxes tied together. Likewise Marc Ausman at Vertical Power was very helpful in laying out the wiring requirements / load planning.
The AFS / VP-X configuration interface works very nicely - it was fun watching each radio spin up as its circuit was activated using the AFS EFIS.
Although the process was fairly time consuming, I think a lot of it went into planning and laying out where things would go.
Based on my experience, I don't you could ask for much more in the way of support from Approach Systems / Vertical Power / Advanced Flight Systems.
Cheers
Les
#40643
Quote:
www.aeroelectric.comwww.buildersbooks.comwww.homebuilthelp.comhttp://www.matronics.com/contributionhttp://www.matronics.com/Navigator?RV10-Listhttp://forums.matronics.comhttp://www.matronics.com/contribution
0
Quote:
1
Quote:
2
Quote:
3
Quote:
4
Quote:
5
Quote:
6
Quote:
7
Quote:
8
[quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
rleffler



Joined: 05 Nov 2006
Posts: 680

PostPosted: Tue Dec 06, 2011 3:41 am    Post subject: Another milestone in the building process Reply with quote

Looks Great! I think I’ll be able to light mine up by the end of the year.

bob

From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Les Kearney
Sent: Monday, December 05, 2011 11:14 PM
To: rv10-list(at)matronics.com
Subject: RE: Another milestone in the building process

Hi Bob

Attached is a picture - nothing exotic at this point. The panel is fiberglass - one that I bought eons ago (when I thought I was in for a 3 year build).

The inserts are bare aluminium for now as I have moved things around which means I have extra holes. I still want to install some annuciator lights over the EFIS screens and have to install some heating vent controls on the right side.

In early Jan I plan to make proper inserts (painted and printed etc).

I also want to install a USB outlet and an ELT remote switch on the right side of the panel.

Cheers

Les


From: owner-rv10-list-server(at)matronics.com (owner-rv10-list-server(at)matronics.com) [mailto:owner-rv10-list-server(at)matronics.com] ([email][mailto:owner-rv10-list-server(at)matronics.com][/email]) On Behalf Of Bob Leffler
Sent: December-05-11 7:50 PM
To: rv10-list(at)matronics.com (rv10-list(at)matronics.com)
Subject: RE: Another milestone in the building process
What, no pictures?

[quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Bob Leffler
N410BL - Phase I
http://mykitlog.com/rleffler
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group