Posted: Sat Feb 11, 2006 6:32 pm Post subject: elevator attach |
|
|
I’m confused.
�
Just started emp attach process after a wonderful 102 hours on the tailcone.
�
Page 11-2 revision 1, step 3, for initial temp install of elevators to HS.� It says to attach the Elevators per Fig 3, using hardware in Detail A.� Ok, I’ve done that.� But I can’t do Detail B yet because I haven’t drilled those holes.� That step is 11-3 Step 2. So question #1 is when do I install the Detail B hardware?� If it’s after Pg 11-3 that seems very out of sequence for these normally well-laid plans, especially since it’s not referenced later.
�
Next, Step 3 also says the elevators should not contact the upper or lower flanges of the HS.� If I pivot the elevator all the way up or all the way down, of course it contact the HS because there’s no control system holding it back yet, and the cutout area on the HS main spar is just for a static stop, it seems. So question #2 is what should be limiting elevator travel at this point?
�
So if I’m not supposed to contact the HS, and there’s no control system in place limiting movement/travel, then question #3 is what defines my full up/ full down travel?
�
Rob Wright #392 (also awaiting VS doubler – rivets are drilled!