Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Builders: Spar box cont.

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Lightning-List
View previous topic :: View next topic  
Author Message
Colin K.



Joined: 04 Sep 2006
Posts: 157
Location: Oklahoma

PostPosted: Sun Feb 24, 2008 4:31 pm    Post subject: Builders: Spar box cont. Reply with quote

After installing the spar box, I noticed that in section 24. Master Cylinder Installation, it says:
22. In the bottom of the rear spar box measure forward from the main gear leg socket 5/8”, and in line with the socket. You should measure from the edge of the hole not the weld.
23. Drill a 1/2” hole here. Start with smaller bit and work you way up, this will be more accurate.
I would have preferred to do this before I fitted the spar box, but now I will do it in place. Access may be a liitle difficult but I think a drill extension may be the solution.
Colin K.
OK
Lightning # 52 under construction.
http://www.mykitlog.com/cojaken [quote][b]


- The Matronics Lightning-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Lightning-List

_________________
Colin K.
OK
Back to top
View user's profile Send private message
pequeajim



Joined: 03 Sep 2006
Posts: 708
Location: New Holland, PA

PostPosted: Sun Feb 24, 2008 5:39 pm    Post subject: Builders: Spar box cont. Reply with quote

Way to keep things going Colin! Keep it up!

I hope you don’t mind that I put a link to your KitLog site under http://www.jimslightning.com/html/cool_links.html

I am trying to fill that page with builder information as I go.

Jim!


From: owner-lightning-list-server(at)matronics.com [mailto:owner-lightning-list-server(at)matronics.com] On Behalf Of Colin J. Kennedy
Sent: Sunday, February 24, 2008 7:28 PM
To: lightning-list(at)matronics.com
Subject: Builders: Spar box cont.


After installing the spar box, I noticed that in section 24. Master Cylinder Installation, it says:
22. In the bottom of the rear spar box measure forward from the main gear leg socket 5/8”, and in line with the socket. You should measure from the edge of the hole not the weld.
23. Drill a 1/2” hole here. Start with smaller bit and work you way up, this will be more accurate.
I would have preferred to do this before I fitted the spar box, but now I will do it in place. Access may be a liitle difficult but I think a drill extension may be the solution.
Colin K.
OK
Lightning # 52 under construction.
http://www.mykitlog.com/cojaken
Quote:
http://www.matronics.com/Navigator?Lightning-List
0
Quote:
1
Quote:
2
Quote:
3
Quote:
4
Quote:
5
Quote:
6
Quote:
7
Quote:
8
Quote:
9
[quote][b]


- The Matronics Lightning-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Lightning-List
Back to top
View user's profile Send private message
Colin K.



Joined: 04 Sep 2006
Posts: 157
Location: Oklahoma

PostPosted: Sun Feb 24, 2008 7:34 pm    Post subject: Builders: Spar box cont. Reply with quote

That's fine Jim. I'm looking forward to your first flight!


Colin K.
OK
Lightning # 52 under construction.
http://www.mykitlog.com/cojaken

[quote]
--


- The Matronics Lightning-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Lightning-List

_________________
Colin K.
OK
Back to top
View user's profile Send private message
info(at)flylightning.net
Guest





PostPosted: Mon Feb 25, 2008 6:42 am    Post subject: Builders: Spar box cont. Reply with quote

Colin,

I believe I have now changed it in the manual but if not I will make it so…

nick


From: owner-lightning-list-server(at)matronics.com [mailto:owner-lightning-list-server(at)matronics.com] On Behalf Of Colin J. Kennedy
Sent: Sunday, February 24, 2008 6:28 PM
To: lightning-list(at)matronics.com
Subject: Builders: Spar box cont.


After installing the spar box, I noticed that in section 24. Master Cylinder Installation, it says:
22. In the bottom of the rear spar box measure forward from the main gear leg socket 5/8”, and in line with the socket. You should measure from the edge of the hole not the weld.
23. Drill a 1/2” hole here. Start with smaller bit and work you way up, this will be more accurate.
I would have preferred to do this before I fitted the spar box, but now I will do it in place. Access may be a liitle difficult but I think a drill extension may be the solution.
Colin K.
OK
Lightning # 52 under construction.
http://www.mykitlog.com/cojaken
Quote:
http://www.matronics.com/Navigator?Lightning-List
0
Quote:
1
Quote:
2
Quote:
3
Quote:
4
Quote:
5
Quote:
6
Quote:
7
Quote:
8
Quote:
9
[quote][b]


- The Matronics Lightning-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Lightning-List
Back to top
Colin K.



Joined: 04 Sep 2006
Posts: 157
Location: Oklahoma

PostPosted: Mon Feb 25, 2008 8:59 am    Post subject: Builders: Spar box cont. Reply with quote

Thanks Nick.

Colin K.
---- flylightning <info(at)flylightning.net> wrote:
Quote:
Colin,



I believe I have now changed it in the manual but if not I will make it so.



nick



_____

From: owner-lightning-list-server(at)matronics.com
[mailto:owner-lightning-list-server(at)matronics.com] On Behalf Of Colin J.
Kennedy
Sent: Sunday, February 24, 2008 6:28 PM
To: lightning-list(at)matronics.com
Subject: Builders: Spar box cont.



After installing the spar box, I noticed that in section 24. Master Cylinder
Installation, it says:

22. In the bottom of the rear spar box measure forward from the main gear
leg socket 5/8", and in line with the socket. You should measure from the
edge of the hole not the weld.

23. Drill a 1/2" hole here. Start with smaller bit and work you way up, this
will be more accurate.

I would have preferred to do this before I fitted the spar box, but now I
will do it in place. Access may be a liitle difficult but I think a drill
extension may be the solution.

Colin K.
OK
Lightning # 52 under construction.
<http://www.mykitlog.com/cojaken> http://www.mykitlog.com/cojaken






- The Matronics Lightning-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Lightning-List

_________________
Colin K.
OK
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Lightning-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You cannot download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group