 |
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
Matt Dralle Site Admin

Joined: 08 Nov 2005 Posts: 26321 Location: Livermore CA USA
|
Posted: Wed Apr 21, 2010 8:40 pm Post subject: RV-8 - Adding Cowling Front Rubber Seals... |
|
|
HOBBS Meter: 2448 Hours
In the front of the lower cowling around the nostrils, there are two rubber gaskets that are riveted to the fiberglass and form a seal between the cowling and the lower engine baffling. Since it was time to taxi test with cowling on, it was time to finally rivet them on. No big deal; just one more thing to be done before the test flight...
Matt Dralle
RV-8 #82880 N998RV
http://www.mattsrv8.com - Matt's RV-8 Construction Blog
http://www.youtube.com/MattsRV8 - Matt's RV-8 HDTV YouTube Channel
Status: Final Bits / Inspection / Test Flight
| - The Matronics RV7-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV7-List |
|
Description: |
|
Filesize: |
71.74 KB |
Viewed: |
1693 Time(s) |

|
Description: |
|
Filesize: |
70.43 KB |
Viewed: |
1693 Time(s) |

|
_________________ Matt Dralle
Matronics Email List Administrator |
|
Back to top |
|
 |
Matt Dralle Site Admin

Joined: 08 Nov 2005 Posts: 26321 Location: Livermore CA USA
|
Posted: Wed Apr 21, 2010 8:55 pm Post subject: RV-8 - Adding Cowling Front Rubber Seals... |
|
|
Whoops! I didn't mean to send this to the List! Nevermind, sorry... It was suppose to go to my building log email address.
Matt
At 09:39 PM 4/21/2010 Wednesday, you wrote:
Quote: | HOBBS Meter: 2448 Hours
In the front of the lower cowling around the nostrils, there are two rubber gaskets that are riveted to the fiberglass and form a seal between the cowling and the lower engine baffling. Since it was time to taxi test with cowling on, it was time to finally rivet them on. No big deal; just one more thing to be done before the test flight...
Matt Dralle
RV-8 #82880 N998RV
http://www.mattsrv8.com - Matt's RV-8 Construction Blog
http://www.youtube.com/MattsRV8 - Matt's RV-8 HDTV YouTube Channel
Status: Final Bits / Inspection / Test Flight
|
| - The Matronics RV7-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV7-List |
|
_________________ Matt Dralle
Matronics Email List Administrator |
|
Back to top |
|
 |
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|