 |
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
Michael Valentine
Joined: 09 Jan 2006 Posts: 108
|
Posted: Sun Jul 09, 2006 8:25 am Post subject: Wing Building |
|
|
Should have read more messages before I responded!
Thanks - this idea is even better and sounds like my new plan. I
really didn't want to learn about swaging and cables and thimbles at
this point. I will personally be much more motiviated by finishing up
the first wing!
Michael
On 7/9/06, Edward Moody II <dredmoody(at)cox.net> wrote:
Quote: |
Actually, you don't even have to tighten the shackle bolts inside the hatch.
Everything can be done in the daylight except bolting the bellcrank back
into its bracket. Feed the pre-thimbled cables through the lightening holes
as you suggested, insert the shackles, bolt them to the bellcrank under the
wing (outside the hatch). Then the bellcrank is bolted to its bracket inside
the hatch. I made my hatch bigger than the plans called for so it ought to
be reasonably easy.
Ed
|
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
 |
paulrod36(at)msn.com Guest
|
Posted: Sun Jul 09, 2006 8:29 am Post subject: Wing Building |
|
|
<?xml:namespace prefix="v" /><?xml:namespace prefix="o" /><![endif]--> When building my wing, before I closed it up I ran two lengths of baler twine from the bellcrank out to the inboard ends and tied them off. With the control wire tied to the twine, we just pull through, and connect. Remember---string will not do. Light rope will not do. A long piece of wire will not do. Lacing cord will not do. You MUST use baler twine, or evil things will happen [img]cid:034701c6a374$67019a90(at)ownerf8535761e[/img]
Paul Rodriguez
601XL/Corvair (dare I say it?)
[quote] ---
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
 |
pmaxpmax(at)HOTMAIL.COM Guest
|
Posted: Sun Jul 09, 2006 1:04 pm Post subject: Wing Building |
|
|
That's the way I did it.
Phil Maxson
601XL/Corvair
Northwest New Jersey
Quote: | From: "Edward Moody II" <dredmoody(at)cox.net>
Subject: Re: Wing Building
Date: Sat, 8 Jul 2006 08:28:43 -0500
I may be wrong but as best I can tell, the swagging can take place outside
the wing, then thread the cables through the lightening holes etc.
Any reason that won't work?
Ed
|
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
 |
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|