Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Load Analysis & Electrical Schematic

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
LarryRosen



Joined: 16 Jan 2006
Posts: 415
Location: Medford, NJ

PostPosted: Wed Oct 04, 2006 6:12 pm    Post subject: Load Analysis & Electrical Schematic Reply with quote

I have posted on my web site the electrical schematic and load analysis
that I am considering. The electrical design is a single battery, dual
alternator design. Comment if you would.

<http://lrosen.nerv10.com/Electic/index.html>

Thanks to all who have before for a great load analysis layout for the .

--

Larry Rosen
RV-10 #356
http://lrosen.nerv10.com


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Larry Rosen
#40356
N205EN (reserved)
<http>
Back to top
View user's profile Send private message Send e-mail Visit poster's website
bob.kaufmann(at)cox.net
Guest





PostPosted: Wed Oct 04, 2006 6:33 pm    Post subject: Load Analysis & Electrical Schematic Reply with quote

I would consider a dual battery instead of a dual alternator.

Bob K

All I know about electricity is that the paddles tingle after the juice goes
into them.

Do not archive

--


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
armywrights(at)adelphia.n
Guest





PostPosted: Wed Oct 04, 2006 8:01 pm    Post subject: Load Analysis & Electrical Schematic Reply with quote

Really? I guess as Bob N. says, your design goals must be the deciding
factor on your decision.

Either option is viable. And even though the U.S. Army doesn't get it right
all the time, they've opted for a single battery, dual alternator design in
their single-engine helicopters. Of course, the option for the 2d battery
is there, but that's usually left for cold-soaked aircraft needing the amps
to start in the middle of the night with no ground power units available.

Now if you plan on a hangared plane where you can hook up a ground power
cable if it's too cold, you may want to choose the single battery/dual
alternator setup. Then you don't have to immediately start the 30 minute
"my-battery-is-going-dead" clock if your only alternator fails that powers
your glass panel.

I'm sure there are some more nice battery/alternator wars in the
aeroelectric list archives that go into choices due to weight, c.g., spare
engine pads, etc. in addition to original design goals.

Rob Wright
#392
Fuse

--


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
GenGrumpy(at)aol.com
Guest





PostPosted: Thu Oct 05, 2006 6:01 pm    Post subject: Load Analysis & Electrical Schematic Reply with quote

In a message dated 10/5/2006 2:01:04 AM Central Standard Time, armywrights(at)adelphia.net writes:
Quote:
--> RV10-List message posted by: "Rob Wright" <armywrights(at)adelphia.net>

Really? I guess as Bob N. says, your design goals must be the deciding
factor on your decision.

Either option is viable. And even though the U.S. Army doesn't get it right
all the time, they've opted for a single battery, dual alternator design in
their single-engine helicopters. Of course, the option for the 2d battery
is there, but that's usually left for cold-soaked aircraft needing the amps
to start in the middle of the night with no ground power units available.

Now if you plan on a hangared plane where you can hook up a ground power
cable if it's too cold, you may want to choose the single battery/dual
alternator setup. Then you don't have to immediately start the 30 minute
"my-battery-is-going-dead" clock if your only alternator fails that powers
your glass panel.

I'm sure there are some more nice battery/alternator wars in the
aeroelectric list archives that go into choices due to weight, c.g., spare
engine pads, etc. in addition to original design goals.

Rob Wright
#392
Fuse

For what it's worth, I chose to use both dual alternators, dual batteries 2 busses (I can connect the 2 if needed). Just now into ground runs before first flight, and I am happy that I decided to go this way - redundancy for intended IFR flight.

Grumpy #40404

DO NOT ARCHIVE
[quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group